Notice: Use of undefined constant mosConfig_absolute_path - assumed 'mosConfig_absolute_path' in /home/birtbuildingcom/www/root/mambots/system/bot_jstats_activate.php on line 25
Строителна компания Бърт Билдинг * Birt Building company - Projects underway Skip to content
Birt Building: Home » Projects » Projects underway
Projects underway
Two residential buildings in the residential complex Mladost 3 Print E-mail
• Two 9 /nine/ storey residential buildings with underground garages, identical in their over-ground part, located in Mladost 3
Housing Estate, regulated land estate VIII-2568,2625,2899, quarter 17, with total built area 10 628,80 m2: block „А” – 5 314.40 m2 and
block “B” – 5 314.40 m2.
• The total number of the apartments in each block is 63 with light height – 2.60 m.
The shops are 8 with light height – 3.20 m. The apartments are one-roomed, two-roomed and three-roomed.
• Each block has the following lay-out: ground floor with 8 /eight/ shops; - 8 /eight/ floors with 5 /five/ apartments on each floor and
2 /two/ studios; first floor under the roof with 4 /four/ apartments and 1/one/ studio; - second floor under the roof with 2 /two/ apartments
The planned garages are 77 – 39 in block “A” and 38 in block “B”. The access to the underground garages is by means of ramps.
Storing premises for the apartments are planned in the basements of each block.
The individual apartments and shops combine high technologies, comfort and security. The buildings match perfectly the environment.   More »
 
 

Mladost 3 project

Mladost 3 project - Location
Location
More info »

Catalogue

Contacts

“Birt Building” Ltd.
Mladost 3 Housing Estate; 26 Georgi Belov Str.
Sofia, Тел: 02/975 37 14
This e-mail address is being protected from spam bots, you need JavaScript enabled to view it
0895 66 76 79 Main office: Yavorov Housing Estate, block.73, entr. B, fl. 5

Skype & ICQ Status

My status

Birtbuilding
403520560